Chapter 55B. Stormwater Management  


Article I. Scope and Purpose
Article II. Definitions
Article III. General Standards
Article IV. Stormwater Management Requirements for Major Development
Article V. Calculation of Stormwater Runoff and Groundwater Recharge
Article VI. Standards for Structural Stormwater Management Measures
Article VII. Sources for Technical Guidance
Article VIII. Safety Standards for Stormwater Management Basins
Article IX. Requirements for a Site Development Stormwater Plan
Article X. Maintenance and Repair
Article XI. Penalties and Severability
HISTORY: Adopted by the Mayor and Borough Council of the Borough of Lavallette 8-21-2006 by Ord. No. 2006-19 (1007). Amendments noted where applicable.

References

Brush, grass and weeds — See Ch. 12.
Cesspool and septic tank prohibition — See Ch. 18.
Flood hazard areas — See Ch. 31.
Sewer use — See Ch. 52.
Site plan review — See Ch. 53A.
Soil removal — See Ch. 54.
Solid waste — See Ch. 55.
Storm sewer system — See Ch. 55A.
Streets and sidewalks — See Ch. 56.
Subdivision of land — See Ch. 57.
Zoning — See Ch. 90.